Skip to content
NICET certified / NFPA 72 / UL-Listed 24/7 Monitoring
Serving Six Pennsylvania Metros▪(724) 660-FIRE
(724) 660-FIRE
NICET CERTIFIED/NFPA 72/PA METROS

Fire Alarm Monitoring Handoff Checklist

Step-by-step checklist for switching fire alarm central station monitoring without service interruption. Dialer capture, account credentials, AHJ notification.

No-obligation · 60-second request
Request your inspection.
A NICET certified technician on every job. Tell us where to start.
Tyrian Lead Form
NICET certified · NFPA 72 · No spam

The handoff checklist.

  • Confirm new central station's UL 827 listing and TMA Five Diamond status.
  • Confirm new station's account number assignment for your building.
  • Schedule the cutover with both stations and the AHJ if local notification is required.
  • Plan dialer-capture or IP-path reprogramming in the panel.
  • Notify the building owner, facilities team, and any tenants that the alarm may briefly be in test mode.
  • Reprogram the panel's communication path to the new station's receiver.
  • Run test alarms; verify new station receives correctly.
  • Confirm old station has acknowledged termination and removed your account from active monitoring.
  • Document the cutover date and the new account credentials in the Record of Completion.
  • Issue audit-grade documentation to the AHJ confirming continuous monitoring.

What can go wrong.

Old station continues to bill after cutover. New station was never properly activated, leaving the panel transmitting to dead air. Dialer capture is incomplete and the panel falls back to old station mid-cycle. AHJ notification missed — building owner discovers months later during a routine inspection. Each is preventable with the checklist.

Tyrian's handoff pattern.

Pre-cutover walk with building owner and the new central station. Panel reprogramming performed on-site with both stations on standby. Test alarms verified at both ends. Documentation issued same-day. Tyrian’s standard scope under monitoring service.

Handoff FAQs.

Some panels support remote reprogramming; many require on-site. Tyrian’s pattern is on-site to verify test alarms before leaving.

Brief test mode is required. The window is typically under 30 minutes.

Yes — see /resources/dialer-capture-fire-alarm-monitoring/.

Account termination is the building owner’s right; Tyrian’s standard handoff letter handles this. Persistent old-vendor refusal is rare but escalates to formal notice.

Keep exploring

Related pages

Fire Alarm Resources →Guides, codes and answers for PA commercial fire alarm.
CMMS Fire Alarm Inspection Integration →How fire alarm inspection records integrate with CMMS systems (IBM Maximo, Fiix, eMaint,…
Fire Alarm Panel Disposal + Detector Recycling PA →Disposal and recycling of decommissioned commercial fire alarm panels and detectors in PA — NRC…
Fire Alarm vs. Fire Sprinkler Monitoring →Why fire alarm monitoring (NFPA 72) and fire sprinkler monitoring (NFPA 13/25 via fire alarm)…
Fire Alarm Glossary →Commercial fire alarm glossary — addressable, NICET, SLC, NAC, AHJ, ITM, IFC, NFPA 72 Chapter…
Hospital Fire Alarm in Tenant Improvement / Renovation →Hospital fire alarm work during tenant improvement and renovation — decommissioning,…
In-Building Radio Coverage Survey →How a BDA/DAS in-building radio coverage survey is performed under IFC §510 and NFPA 1221 —…
NFPA 72 2025 Edition Updates →What changed in the NFPA 72 2025 edition vs prior — Chapter 14 ITM updates, Chapter 24 mass…
Tyrian Fire Systems — commercial fire alarm

Commercial fire alarm — six Pennsylvania metros. NFPA 72 inspection, installation, monitoring. Open systems. Your passwords, your panel, your documentation.

244 Pfeifer Rd, Harmony, PA 16037
NICET certifiedUL-Listed MonitoringNFPA 72 Compliant© Tyrian Fire Systems