The NFPA 72 Acceptance Test
What the NFPA 72 §10 acceptance test of a new fire alarm system actually involves — AHJ walkthrough, device verification, Record of Completion.
What the acceptance test covers.
100% device verification — every smoke detector, heat detector, pull station, NAC strobe tested. Notification appliance audibility and visibility verified per §18.4 and §18.5. Secondary power (battery) tested under load per §14.4. Central-station signal verification end-to-end. Panel programming verified against design submittal. AHJ inspector walks with the certifying NICET technician.
What gets recorded.
Record of Completion per §7.5 — the gold-standard closeout document. Every tested device entered in the panel addressing schedule. Battery calculations attached. NICET certified certifying technician signed. Building owner gets the original; AHJ gets a copy.
What can cause an acceptance-test failure.
Missing devices. NAC circuits not sync’d. Voltage drop on long pulls exceeding spec. Programming mismatched to approved drawings. Battery sizing under spec. Each is preventable with proper pre-acceptance walkthrough.
Acceptance test FAQs.
Does Tyrian perform pre-acceptance walks?
Yes — internal pre-acceptance is standard scope before the AHJ inspector visit, to surface and resolve any issues before the formal test.
How long does the acceptance test take?
Building-dependent. Small commercial: half-day. Large multi-floor: 1-3 days. Hospital or campus: multi-day phased.
Who needs to be present?
Tyrian’s NICET certified technician, the AHJ inspector, and ideally the building’s facilities point-of-contact.
What if a device fails the test?
Documented; remediation scheduled; partial acceptance possible depending on AHJ. Most issues are surfaced and resolved during internal pre-walk.