Fire Alarm for Property Managers: Portfolio ITM & Switch
Fire alarm services for property managers running multi-site portfolios in Pennsylvania. Portfolio scheduling, multi-site ITM, vendor-switch playbooks, audit-grade inspection reports your insurance carrier will accept, CMMS integration.
The PM workday with a fire alarm vendor (the version you're tired of)
Three vendor calls already this week: one to chase a missed quarterly battery test on Building 7, one to ask why the report on Building 11 hasn’t been delivered, one because the insurance carrier asked for inspection records on Building 3 and the file you have is a tag, not a report.
Different vendors on different buildings because the portfolio grew by acquisition. Each one bills on a different cycle, sends inspection records in a different format, and answers to a different account rep. Three separate AHJ relationships you didn’t choose to manage.
Your CFO asks for a fire alarm capital projection for the next five years. The current vendors don’t produce that. You’re writing it from inspection-report fragments.
A new building lands in the portfolio. The previous owner’s vendor goes silent. The panel password isn’t in the closeout file.
What Tyrian does for the property manager
One account manager — a named senior — for the portfolio. Not three reps, not a call center. The same person you spoke to in January answers the phone in October.
One ITM calendar covering every building, synced to your CMMS if you use one (Yardi, AppFolio, MRI, RealPage, Building Engines, MRI Vendor Café). Quarterly batteries, semi-annual visits, annual full-system tests — all coordinated.
One consolidated quarterly report covering every property in the portfolio. Per-building drilldown is available; portfolio-level rollup is the default for your CFO conversation.
One insurance-handoff format — the inspection records drop directly into your underwriter’s file without redaction.
Vendor-switch playbook for inherited buildings. Audit walk → AHJ notification → monitoring handoff → inspection-cycle continuity. Typical close: 14-21 business days per building.
5-year capital projection at the portfolio level — known ITM cadence + projected device replacements (10-year smoke detector replacement under NFPA 72) + panel lifecycle planning + known retrofit triggers (POTS sunset, code amendments).
Three pillars, expressed for the property manager
Senior Craft — NICET certified on first roll. Tech tenure published. The tech who walked Building 7 in January is the tech who walks Building 7 in April. You don’t re-explain the building to a new face.
Audit-Grade Work — every inspection report drops into the insurance binder verbatim. Every finding has a photo, an NFPA citation, a severity rating, a repair recommendation. Your insurance carrier doesn’t kick the file back.
No Hostage — clause 12 of the service agreement. Your panel is yours, your programming is yours, your passwords are yours. If you fire us, the next vendor gets full handover. The next building you acquire is portable, not trapped.
CMMS platforms we integrate inspection records into
Yardi Voyager, AppFolio (Property Manager Plus, MAX), MRI Software (Vendor Café, BuildingEngines integration), RealPage (OneSite, OpsTechnology), Building Engines (Building Engines + Prism), HappyCo, Eptura, Accruent (incl. ServiceChannel), and CSV/SFTP delivery for portfolios that run an in-house operations tool.
Inheriting a building? The switch playbook.
Day 1: audit walk on the inherited building. Document the system as-found — devices, panel firmware, programming archive (if available), AHJ records on file, last inspection record, monitoring path.
Day 2-3: gap analysis. What’s missing — battery load tests, NFPA citations on findings, current AHJ acceptance, panel-password recovery if held by prior vendor.
Day 4-7: written notice to AHJ of vendor change. Test-signal verified end-to-end on monitoring path. Inspection-cycle continuity confirmed against NFPA 72 calendar.
Day 8-21: documented switch closed. Inherited building now runs on the same calendar, format, and account-management model as the rest of the portfolio.
See /resources/inherited-fire-alarm-system-checklist/ and /resources/switching-fire-alarm-vendor-pa/ for the detailed playbooks.
Property managers ask
Request a portfolio-level consultation
30-minute conversation about your portfolio — current vendor situation, ITM cadence, insurance posture, switch plan if needed. No quote, no contract on the call.

