Sample Inspection Reports
Redacted sample fire alarm inspection reports. See what audit-grade NFPA 72 documentation looks like — photo, citation, repair recommendation per finding.
Five things that separate audit-grade from boilerplate.
Sample report excerpts (redacted).
Compare against the report you got last year.
If your current vendor’s annual NFPA 72 inspection report fits on two pages, contains no photos, contains “per NFPA 72” without a section number, and is signed only with a company logo — that is the boilerplate pattern we are positioning against. It does not stand up to AHJ scrutiny when the inspector asks for documentation of a specific finding. It does not satisfy an insurance carrier’s due-diligence review. It does not protect the facilities director from negligent-certification exposure if there is a fire.
Sample report FAQs.
Are these real reports?
Yes — redacted excerpts from real Tyrian inspections. Location identifiers and client names are removed; finding text, photos, NFPA citations, and signing-tech NICET numbers are verbatim from the original.
Will the report you give me look like this?
Yes. The Tyrian inspection report format is standard across the six-metro footprint. Every report follows NFPA 72 §10.18 Record of Inspection and Testing structure.
What if my AHJ wants a different format?
We will produce the format the AHJ requires. The audit-grade content is the same — only the form changes. PA AHJs we work with regularly include Pittsburgh PLI, Erie Fire Inspection, Harrisburg, Lancaster, York, and Reading municipal fire offices.
Can I share these samples with my insurance carrier?
Yes. The redacted samples are publishable. Building owners frequently share them with insurance carriers as documentation of the inspection standard they have engaged.
How do I get a report that looks like this for my building?
Request an audit-grade inspection. We will schedule a named senior NICET-certified technician, perform the NFPA 72 inspection, and deliver the report in this format within 48 hours after the inspection is complete and the office has received the findings electronically.

